MyPinoyTools

PELCO II (Pampanga II Electric Cooperative) · Residential

Official rates Updated 2026-09-15

PELCO II's rates, explained charge by charge

Your PELCO II bill lists more than a dozen separate charges, and the bill itself doesn't explain how they add up to the total you pay. These are PELCO II's official residential rates for August 2026 billing — this page walks through what each charge is and how your kilowatt-hours become the amount you pay.

August 2026 billing · 30-day period · no local franchise tax (PELCO II is a cooperative)

Independent tool. Not affiliated with Pampanga II Electric Cooperative (PELCO II).

How it adds up

How the total is built

A PELCO II residential bill is the sum of several groups of charges. The largest is usually generation — the cost of the electricity itself. After that come transmission (moving power across the national grid), ancillary service (reserve services that keep the grid stable), system loss, distribution (PELCO II's own delivery charge), government taxes, and universal charges mandated by law. Each is calculated per kilowatt-hour or as a fixed amount, then added together. Most of your bill is made up of costs PELCO II passes through from other providers, not charges PELCO II sets on its own.

Cooperative, not a franchise holder

Why there's no Local Franchise Tax on your bill

Every other utility on this site — Meralco, Angeles Electric, San Fernando Electric, Cabanatuan Electric, and Dagupan Electric — is a private company operating under a local government franchise, and pays a Local Franchise Tax that shows up as its own line. PELCO II is different: it's a member-owned electric cooperative regulated by the National Electrification Administration, not a franchise holder. That's why a PELCO II bill has no Local Franchise Tax line, and this calculator doesn't add one.

Source: PELCO II billing statements; National Electrification Administration.

At every usage level

The rates this month

What a residential bill comes to at each usage level, and the individual per-kWh rates behind it — computed component by component from PELCO II's official August 2026 rates. Assumes a 30-day billing period; your exact reading dates may shift the total slightly.

ConsumptionTotal billAll-in per kWh
100 kWh₱1,187.13₱11.87
200 kWh₱2,368.68₱11.84
300 kWh₱3,550.21₱11.83
400 kWh₱4,731.74₱11.83
500 kWh₱5,913.28₱11.83
Every per-kWh charge, in fullAll 17 line items.Show full breakdown ▾
ChargeRate per kWh
Generation Charge (kWh)₱6.3080
Transmission System Charge (kWh)₱0.5363
Ancillary Service Charge (kWh)₱1.1218
System Loss (kWh)₱0.9671
Distribution Charge (kWh)₱0.4613
Supply System Charge (kWh)₱0.5376
Metering System Charge (kWh)₱0.3205
Reinvestment Fund / CAPEX (kWh)₱0.2178
REC Charge (kWh)₱-0.0536
Lifeline Subsidy Rate (LSR)₱0.0100
Senior Citizen Subsidy₱0.0000
Missionary Electrification (NPC)₱0.2662
Missionary Electrification (RED)₱0.0101
Environmental Charges (kWh)₱0.0025
NPC Stranded Debts (kWh)₱0.0428
FiT-All (Renewable)₱0.3359
GEA-All (Renewable)₱0.0000

Every month, regardless of usage

Fixed monthly charges

Owed whatever your consumption, which is why even a very low-usage month still carries a bill.

ChargeAugust 2026
Retail Customer Charge (P/mo)5.00/month

The biggest single charge

The generation charge

Generation is the cost of producing the electricity you used, and it is usually the largest single part of your bill. PELCO II buys electricity from power suppliers and passes that cost through to you. Because it's a pass-through cost, the generation charge can differ from one month to the next depending on what power costs during that billing period. When your total bill changes even though your usage stayed about the same, the generation charge is the most common reason.

Source: PELCO II billing statements.

Taxes

How PELCO II shows VAT

PELCO II itemizes value-added tax across several components — you'll see separate VAT lines for generation and system loss, one combined line for transmission and ancillary service (billed as one line on the bill's own VAT section), plus separate percent-based VAT lines for distribution and for the bill's "Other Charges" section, rather than a single lump sum. The total tax you pay is the sum of these lines.

ComponentVAT (August 2026)
Generation₱0.3108/kWh
Transmission₱0.1775/kWh
System Loss₱0.0583/kWh
Distribution (PELCO II)12%
Other Charges12%

Franchise area

Who PELCO II serves

Pampanga II Electric Cooperative (PELCO II) is the distribution utility for Mabalacat City, Guagua, Lubao, Porac, Sta. Rita, Sasmuan and Bacolor in Pampanga, plus resettlement areas in Sta. Lucia (Magalang), Model Community (Porac), and Palmayo and Mawacat (Floridablanca). Its head office is in Guagua. If you live outside this franchise area — including other parts of Pampanga served by PELCO I or PELCO III — your electricity is likely provided by a different utility, and this calculator's PELCO II rates will not match your bill. Check the utility name printed on your own bill to be sure.

Source: Pampanga II Electric Cooperative, Inc. (billing address and franchise details).

These are the rates. What's your bill?

Put your own consumption through the calculator and see where every peso goes.

Open the PELCO II calculator

Frequently asked questions

Why is my PELCO II bill higher this month?

The most common reason is the generation charge, which tracks the cost of power during that billing period and can change month to month even when your usage doesn't. Transmission, ancillary service, system loss, distribution, taxes, and universal charges make up the rest.

Does this calculator show my exact bill?

It gives an accurate estimate based on PELCO II's published residential rates for the current billing month. Your actual bill may differ slightly depending on your exact reading dates and any account-specific adjustments.

Is MyPinoyTools affiliated with PELCO II?

No. MyPinoyTools is independent and not affiliated with Pampanga II Electric Cooperative. This is a free tool built to help you understand your bill.

Figures are for August 2026 billing and were last updated 2026-09-15. Rates change monthly.

See our methodology for how each charge is computed and how we check our numbers. MyPinoyTools is not affiliated with Pampanga II Electric Cooperative (PELCO II).